Continuation of the design and construction of the S7 expressway from the border of the Świętokrzyskie Voivodeship to Kraków, section Widoma junction (without the junction) – Kraków (with connection to the Nowa Huta junction)

On behalf of Gulermak, as part of the construction of the Krakow Bypass, we are carrying out monitoring of the railway embankment and geodetic monitoring of supports related to the construction of an overpass using the incremental method.